An AI data center is a data center that operators design specifically for training and running AI models. Most of the computing power there comes from GPUs and other AI accelerators rather than conventional CPU servers. Power supply, cooling and networking are tailored to this load.
During training, a model learns from large amounts of data. During inference, the finished model answers requests, for example in a chatbot.
The technology behind it is called AI infrastructure. It includes GPU servers, fast networks, storage, cooling and the software that runs it all. A few GPU servers in a server room do not make an AI data center, though. The building has to deliver the power continuously and remove the heat reliably.
How Does an AI Data Center Differ from a Conventional Data Center?
On paper, the building blocks are the same: servers, storage, networking, power and cooling. AI systems, however, pack far more computing power into the same space. Almost everything else follows from this density.
| Feature | Conventional data center | AI data center |
|---|---|---|
| Compute load | CPU servers for applications, databases and virtual machines | GPU servers for training and inference |
| Power per rack | typically below 10 kW in 69 percent of data centers (Uptime Institute) | up to 142 kW NVIDIA GB300 NVL72 rack; 230 kW NVIDIA VR200 NVL72 rack; 245 kW AMD Helios rack; 1 MW is conceivable in the future |
| Cooling | mostly air | Full liquid cooling of all system components (CPU, GPUs, memory, chipset, power supplies, etc.), smaller systems and storage also with air |
| Network | traffic mainly to users and applications | high bandwidth and low latency between many GPUs |
| Storage | standard storage | parallel storage that keeps the GPUs constantly supplied with data |
At power densities of up to 245 kW per rack, air cooling reaches its technical limits. These systems therefore remove all heat through direct liquid cooling: in addition to CPUs and GPUs, cold plates also connect memory, network components, NVLink switches, voltage regulators and power supplies to the water loop. This enables fanless operation, higher energy efficiency and reuse of the waste heat at a high temperature level. MEGWARE has many years of experience with direct liquid-cooled HPC systems and supports such installations from planning through to operation.
What Is the Difference Between an AI Data Center and an AI Factory?
The AI data center is the facility itself: building, power, cooling and hardware. The term AI factory, by contrast, describes how someone uses this facility. Under this name, the EU funds systems that research institutions and companies use together.
How Are AI Data Centers and HPC Related?
Technically, the two are closely related. A high-performance computing center for simulations links many compute nodes into an HPC cluster. AI training works the same way: many GPUs compute a task together and constantly exchange data along the way.
Both therefore place similar demands on networking and cooling. Anyone who already runs HPC clusters knows many of the problems that also come up in an AI data center.
What Makes Up the AI Infrastructure in an AI Data Center?
High-performance AI infrastructure consists of six tightly integrated building blocks: GPU servers, a high-speed network, storage systems, power supply, cooling and software. The weakest link determines overall performance: if the network or storage is undersized, expensive GPU resources sit idle. Likewise, the available connected load and cooling capacity limit how many systems can run per rack and per data center. With current GPU racks drawing more than 100 kW, power and heat removal are increasingly becoming the limiting factor. MEGWARE plans these components as one coordinated system, from the power and cooling infrastructure to the software stack.
What Do the GPU Servers Do?
GPU servers deliver the computing power. A GPU performs thousands of calculations at the same time, and that is exactly how neural networks work. Small projects get by with a single server, while training large models spreads across thousands of GPUs.
Why Does an AI Data Center Need Such a Fast Network?
During training, the GPUs constantly exchange intermediate results. If the network is too slow, expensive GPUs sit idle. GPU networking works on two levels. Within a server or rack, a scale-up interconnect links the GPUs directly, for example NVIDIA NVLink or AMD Infinity Fabric. Rack-scale systems use it to combine up to 576 GPUs (NVIDIA Rubin Ultra) into a single compute unit. A scale-out network with high bandwidth and low latency handles communication between the servers, for example InfiniBand, Omni-Path or RDMA-capable Ethernet.
Which Storage Suits AI Workloads?
The training data has to reach the GPUs fast enough. NVMe SSDs and parallel file systems are common. A parallel file system distributes the data across many storage nodes and can therefore serve many GPU servers at the same time.
How Do You Cool an AI Data Center?
At high power densities, air is not enough. Liquid cooling removes the heat directly at the components via cold plates. Because the cooling water can reach up to 60 °C, the waste heat can often be used for heating. MEGWARE developed its own system for this: ColdCon, which was used in the CooLMUC-3 supercomputer at the Leibniz Supercomputing Centre in Garching, among others.
Which Software Is Part of the AI Infrastructure?
Only the software turns many servers into a system that teams can work with. Cluster management and job schedulers distribute the tasks across the GPUs. NVIDIA AI Enterprise provides optimized frameworks and ready-to-use model containers.
Which NVIDIA GPUs Suit Which AI Workload?
The most powerful GPU is not automatically the most economical choice. What matters is the specific workload: training large models from scratch requires maximum computing power, large GPU clusters and fast interconnects. Fine-tuning adapts an existing model to your own data. This requires significantly less computing power. For inference, meaning running finished models, the key factors are enough GPU memory for the model size, throughput and latency, and energy efficiency in continuous operation.
MEGWARE supports the selection with vendor-independent consulting. In the MEGWARE Benchmark Center, you can test your own models and applications on current GPU platforms and compare the results directly. This way, your investment decision rests on real measurements instead of theoretical data sheet figures.
The GPU benchmark report RTX PRO 6000 vs. H200 from the MEGWARE Benchmark Center shows how far apart two GPUs can be in practice. It compares both GPUs for inference with three language models ranging from 32 to around 125 billion parameters. The H200 has 141 GB of HBM3e memory, the RTX PRO 6000 Blackwell 96 GB of GDDR7.
The page on NVIDIA GPUs for generative AI presents the current models.
How Much Power Does an AI Data Center Need?
An AI rack needs many times the electrical power of a conventional server rack. According to the Uptime Institute, the average rack power in 69 percent of data centers is below 10 kW. An NVIDIA GB300 NVL72 with 72 GPUs, by contrast, requires up to 142 kW according to NVIDIA. The next system generation already reaches up to 245 kW per rack, and power densities of more than 1 MW per rack are expected in the long term. All the electrical power the systems draw turns into heat. You should therefore clarify power supply and cooling infrastructure before you choose the GPU platform, and design both for future generations. MEGWARE includes both aspects in the planning from the start.
What Does the German Energy Efficiency Act Require?
The German Energy Efficiency Act (EnEfG) applies to data centers with a non-redundant connected load of 300 kW or more. Under Section 11 EnEfG, anyone who puts a new data center into operation from July 1, 2026 must reach a PUE of no more than 1.2 within two years at the latest. Existing facilities must reach 1.5 from July 2027 and 1.3 from July 2030.
The PUE divides the energy demand of the entire data center by the demand of the IT. At 1.2, every 100 kWh for IT allows at most 20 kWh for cooling, power distribution and lighting.
New data centers must also reuse energy outside the data center, usually as heat. The quota depends on the year the data center goes into operation: 10 percent from July 2026, 15 percent from July 2027 and 20 percent from July 2028. Liquid cooling helps with both requirements. It needs less energy than air cooling and supplies heat that is easier to reuse.
Does Your Company Need Its Own AI Data Center?
A new build is rarely necessary. Many companies retrofit their existing data center and equip individual racks with a stronger power connection and liquid cooling. Others place their GPU servers with a colocation provider that is set up for high power densities. If you don't want any hardware of your own, you can rent computing time in the cloud or in an AI factory.
Your own hardware pays off above all with consistently high utilization and sensitive data. For tests and fluctuating loads, rented computing time is usually the better fit.